1. The approval
of layout is valid for 2 years duration. If the layout
development is not complete in 2 years time, the approval needs to be
renewed before the validity is expired.
2. Under site release regulation, on completion of civil works like
asphalting of road, underground drainage, storm water drainage, drinking water, electrification, Authority will inspect the layout and if found satisfactory the sites vested with Authority(40%) will be released for registration.
3. The park, road, civic amenities sites, underground drainage, water and electricity needs to be developed on priority basis within 18 months or else the layout approval may be revoked without prior notice.
4. Sewage treatment plant will have to be established at appropriate
location conforming to Karnataka State Pollution Control Board guidelines.
5. A license issued under Karnataka Gram Panchayat Act / Karnataka
Municipality Act is essential before execution of development work.
6. Changes in the approved layout are not permissible without prior
approval from Authority.
7. Any existing tree or vegetation to be conserved to the extent possible
and new plants to be grown in the either sides of streets and park.
8. Building in the approved layout shall compulsorily adapt Rain Water Harvesting and steps should be taken for augmentation of ground water at layout level.
9. The roads, parks are to be developed and maintained, while civic amenity sites are to be protected against encroachment till such time Authority may deem necessary.
10. Approach to adjoining land or pieces of land within layout but not part of it should be guaranteed.
11. The layout approval is technical in nature; it shall not be used to
prove ownership and any other right on the land.
12. The Authority is not responsible for any civil dispute relating to the
land.
13. If any information or records provided to Authority for approval turns out to be fake, the approval is immediately revoked.
14. Advertisement for marketing of the plots in the layout should
compulsorily mention approval no. and date.
15. Footpath has to be built on both sides of road to facilitate pedestrian movement.
16. If any of the above conditions are violated, the approval is revoked
with immediate effect without prior notice.
development is not complete in 2 years time, the approval needs to be
renewed before the validity is expired.
2. Under site release regulation, on completion of civil works like
asphalting of road, underground drainage, storm water drainage, drinking water, electrification, Authority will inspect the layout and if found satisfactory the sites vested with Authority(40%) will be released for registration.
3. The park, road, civic amenities sites, underground drainage, water and electricity needs to be developed on priority basis within 18 months or else the layout approval may be revoked without prior notice.
4. Sewage treatment plant will have to be established at appropriate
location conforming to Karnataka State Pollution Control Board guidelines.
5. A license issued under Karnataka Gram Panchayat Act / Karnataka
Municipality Act is essential before execution of development work.
6. Changes in the approved layout are not permissible without prior
approval from Authority.
7. Any existing tree or vegetation to be conserved to the extent possible
and new plants to be grown in the either sides of streets and park.
8. Building in the approved layout shall compulsorily adapt Rain Water Harvesting and steps should be taken for augmentation of ground water at layout level.
9. The roads, parks are to be developed and maintained, while civic amenity sites are to be protected against encroachment till such time Authority may deem necessary.
10. Approach to adjoining land or pieces of land within layout but not part of it should be guaranteed.
11. The layout approval is technical in nature; it shall not be used to
prove ownership and any other right on the land.
12. The Authority is not responsible for any civil dispute relating to the
land.
13. If any information or records provided to Authority for approval turns out to be fake, the approval is immediately revoked.
14. Advertisement for marketing of the plots in the layout should
compulsorily mention approval no. and date.
15. Footpath has to be built on both sides of road to facilitate pedestrian movement.
16. If any of the above conditions are violated, the approval is revoked
with immediate effect without prior notice.