Wednesday, 23 July 2014

3 Real Estate Terms Which ConFused You

Carpet Area
Carpet area is the area that lies with the constructed walls. That is, it is the usable floor area that can be covered by the carpet. This does not consider the width of the walls.

Built Up Area
In a simple Mathematical Expression:
*Built Up area = Carpet Area + The thickness of the Walls + the Balcony areas

Super Built Up Area
This also includes the common service area of an apartment, For example: Lobby area, Elevator Shaft and Stairs.

A Simple Mathematical representation would be:
*Super Built Up area = Built up area + All sharable common areas/Unit Owners
The super Built up area is a term pertinent to multi- Dwelling units.


Monday, 14 July 2014

UNION BUDGET 2014-15 Analysis – Real Estate Sector



I. Industry Scenario:

Real estate sector plays an important role in the Indian economy, contributing around 6-7% to the GDP of India and it also one of the highest employment generating sectors. The real estate in India is highly fragmented, capital Intensive in nature and is yet to receive an industry status. The sector has close linkages with the economy and therefore is highly cyclical in nature. Indian real estate sector has been on a roller coaster ride since 2005 along with the government’s policy to allow foreign direct investment and has been riding through many highs and lows since then. However, the demand for the real estate sector was lethargic post global economic slowdown in 2008.

II. Previous Budget Policies:

Key policies announced during the union budget for 2013-14 were allocating funds to rural housing schemes and urban housing schemes to boost fund availability, providing additional interest deductions to first home buyers to boost new home sales, developments of the industrial corridor between Delhi-Mumbai and develop 7 new cities and 2 smart industrial plans which will provide impetus to real estate development in the long term. However, none of the policies have had an impact on short term issues like lack of demand and clarity on approval clearances, etc.

III. Expectations from Budget 2014-15:

Key Challenges faced by Indian real estate sector in the current scenario are lack of clear land titles, absence of industry status, lack of adequate source of finance, approvals and procedural difficulties, higher interest costs, rising material and manpower costs due to inflation. Favorable policy developments expected in the union budget 2014-15 which will help in have access cheaper funds, faster clearances of approvals, revamp demand in the industry etc. are as follows:
 
  • IInfrastructure status to be accorded in Real Estate/ Housing Sector which would help to raise funds at lower interest rates.
  • Incentives for low cost housing and township projects in form of increased credit availability, Interest Subvention and Tax rebate.
  • Procedures for introduction of real estate regulatory bills to bring transparency in the sector. 
  • Increasing exemption limit of principal repayment limit to Rs.3 Lakhs and separating it from other 80c exemptions.
  •  Increasing exemption on interest on home loan u/s 24 of Income tax act

  • Guidelines on real estate investment trusts which would help to meet the funding requirement of the industry.

IV. Union Budget 2014-15 Proposals and Impact:

Budget Proposals
Impact on the Industry
  •   Incentives for Real Estate Investment Trusts (REITS) Complete pass through for the purpose of taxation.
  •  Introducing Infrastructure Investment Trusts for infrastructure projects similar to REITS

Very positive
Both the instruments will attract long term finance from foreign and domestic sources for real estate sector.

  •  Increasing Basic Exemption limit to 2.5 Lakhs, 80C Exemption limit to 1.5 Lakh, interest deduction u/s 24 to 2 Lakhs

Very Positive
Increase in disposable income and direct benefits on interest on housing loan augurs well for real estate industry

  • Provided Rs.7060 crore to develop 100 smart cities,

  •  Allocate for National Housing Bank (NHB) increased to Rs.8000 crore for rural housing scheme

  •  Allocation of Rs.4000 Crore thru National Housing Bank (NHB) for cheaper credit to Low cost affordable housing

Positive

Although the funds allocated may not be very significant compare to actual want of funds to develop new smart cities, however this shows government Endeavour to create new cities to fulfill the requirement of urban economic growth.


Thursday, 3 July 2014

CONDITIONS LAID BY BMRDA FOR APPROVAL OF LAYOUT

1. The approval of layout is valid for 2 years duration. If the layout
development is not complete in 2 years time, the approval needs to be
renewed before the validity is expired.


2. Under site release regulation, on completion of civil works like
asphalting of road, underground drainage, storm water drainage, drinking water, electrification, Authority will inspect the layout and if found satisfactory the sites vested with Authority(40%) will be released for registration.


3. The park, road, civic amenities sites, underground drainage, water and electricity needs to be developed on priority basis within 18 months or else the layout approval may be revoked without prior notice.


4. Sewage treatment plant will have to be established at appropriate
location conforming to Karnataka State Pollution Control Board guidelines.


5. A license issued under Karnataka Gram Panchayat Act / Karnataka
Municipality Act is essential before execution of development work.


6. Changes in the approved layout are not permissible without prior
approval from Authority.


7. Any existing tree or vegetation to be conserved to the extent possible
and new plants to be grown in the either sides of streets and park.


8. Building in the approved layout shall compulsorily adapt Rain Water Harvesting and steps should be taken for augmentation of ground water at layout level.


9. The roads, parks are to be developed and maintained, while civic amenity sites are to be protected against encroachment till such time Authority may deem necessary.


10. Approach to adjoining land or pieces of land within layout but not part of it should be guaranteed.


11. The layout approval is technical in nature; it shall not be used to
prove ownership and any other right on the land.


12. The Authority is not responsible for any civil dispute relating to the
land.


13. If any information or records provided to Authority for approval turns out to be fake, the approval is immediately revoked.


14. Advertisement for marketing of the plots in the layout should
compulsorily mention approval no. and date.


15. Footpath has to be built on both sides of road to facilitate pedestrian movement.


16. If any of the above conditions are violated, the approval is revoked
with immediate effect without prior notice.